EU Member States have endorsed a Commission proposal to invest €594 million of EU funds ineight cross-border energy infrastructure projects under the Connecting Europe Facility (CEF)for Trans-European Networks for Energy. In the last call for funding proposals open to Projects of Common Interest (PCIs) from the 5th PCI list of November 2021, five carbon dioxide (CO2) networks projects, one gas storage project, and two projects in the electricity sector have been selected for funding.
At a time when there is increasing momentum for the development of carbon capture, storage and utilisation (CCUS) to decarbonise hard-to abate sectors, an unprecedented amount of CEF funding for works (almost €480 million) will be awarded to four CO2 transport and storage projects. They constitute the first building blocks of a future Europe-wide carbon value chain that are scheduled for completion before the end of the decade and are therefore expected to contribute to the EU’s 2030 decarbonisation objectives.