« Back to News

Jordan’s new 24-megawatt solar power project prepares for operation

Water Minister Mohammad Najjar on Tuesday announced the start of procedures to operate a 24-megawatt solar photovoltaic project in the Disi area through the Planning and Management Department’s Energy Unit (EnU). A ministry statement, cited by the Jordan News Agency, Petra, referred to the successful completion of the BE reverse electrification process, a joint effort between the ministry and the National Electric Power Company (NEPCO).

Link: https://www.zawya.com/en/economy/levant/jordans-new-24-megawatt-solar-power-project-prepares-for-operation-bvgd9fxs

® JIAC 2017 – C.F. 97866940584 - Credits